Services

Application for Authorization Division

Tie-in Connectivity

Online application - For an entity desirous to develop the upstream connectivity requirement near a common carrier or contract carrier natural gas pipeline, a detailed proposal for the connectivity shall be submitted by the concerned entity to the Board indicating the details of the gas sources or injection points facilities, existing natural gas pipeline infrastructure in the vicinity and demand-supply projections along with the length and capacity of the proposed Tie-in Connectivity.

Application for Spur lines

An entity intending to lay a spur line beyond the tariff zone shall submit its purpose along with the full details on the spur-line length, route, capacity, and details of the customers to be served. The entity must pay the online application fee as specified under the Petroleum and Natural Gas Regulatory Board (Levy of Fee and Other Charges) Regulations, 2007.

Application for Extension of Natural Gas Pipeline/Petroleum and Petroleum Products Pipelines

An entity may extend the authorized length of the natural gas pipeline up to ten per cent. or 50 kilometres whichever is lower from the point of origin or the endpoint in the demand centres outside the existing tariff zone and shall submit to the Board the full particulars, and map of all facilities justification for the proposal and seek prior authorization from the Board.

Submission of Expression of Interest for Natural Gas/Petroleum and Petroleum Products Pipeline

An entity desirous of laying, building, operating, or expanding a natural gas pipeline/petroleum and petroleum products pipeline shall submit an expression of interest to the Board in the form of an application at Schedule A along with an application fee as specified under the Petroleum and Natural Gas Regulatory Board (Levy of Fee and Other Charges) Regulations, 2007.

Compliance with PNGRB Access Code Regulations (CGD, NGPL, PPPL)

• Uploading of details of CGD/ pipelines in the system. • Fill in the details as per formats given in the respective regulations including annexures in an analytical manner. • Provide available capacity of each section of the pipeline in the map in a user-friendly manner (so that any new customer can get benefit from it). • Auto reminders to the user via SMS or email. • Generation of various analytical and management reports etc.

Application for transfer of authorization from one entity to another in respect of CGD Network

An application fee has been proposed for all the transfer of authorization requests which is under consideration by the Board. Accordingly, the transfer requests of all the entities have been kept on hold until the finalization of the proposed fee. Thereafter, the requisite fee shall be applicable to all the transfer of authorization requests.

Portfolio

PNGRB Authorization Division

Tie-in Connectivity

Application Desc

Spur lines

Application Desc

Extension

Application Desc

Expansion

Application Desc

Expression of Interest

Application Desc

Access Code Regulations

Application Desc

Transfer of Authorization

Application Desc

About

Lorem ipsum dolor sit amet consectetur.

  • 2009-2011

    Our Humble Beginnings

    Lorem ipsum dolor sit amet, consectetur adipisicing elit. Sunt ut voluptatum eius sapiente, totam reiciendis temporibus qui quibusdam, recusandae sit vero unde, sed, incidunt et ea quo dolore laudantium consectetur!

  • March 2011

    An Agency is Born

    Lorem ipsum dolor sit amet, consectetur adipisicing elit. Sunt ut voluptatum eius sapiente, totam reiciendis temporibus qui quibusdam, recusandae sit vero unde, sed, incidunt et ea quo dolore laudantium consectetur!

  • December 2012

    Transition to Full Service

    Lorem ipsum dolor sit amet, consectetur adipisicing elit. Sunt ut voluptatum eius sapiente, totam reiciendis temporibus qui quibusdam, recusandae sit vero unde, sed, incidunt et ea quo dolore laudantium consectetur!

  • July 2014

    Phase Two Expansion

    Lorem ipsum dolor sit amet, consectetur adipisicing elit. Sunt ut voluptatum eius sapiente, totam reiciendis temporibus qui quibusdam, recusandae sit vero unde, sed, incidunt et ea quo dolore laudantium consectetur!

  • Be Part
     Of Our
     Story!

Members

Lorem ipsum dolor sit amet consectetur.

Shri Anil Kumar Jain

Chairperson

Shri Gajendra Singh

Member

Shri A.K. Tiwari

Member

Shri A. Ramana Kumar

Member

Contact Us

Lorem ipsum dolor sit amet consectetur.